Photographs:

Bags of iron being off-loaded to
equipment/supplies staging area at boat ramp

All the iron bags are on-site and
stored at the boat ramp

Mixing the ZV-iron flakes with sorted
sediments

The first part of the barrier is
completed by backfilling the excavated area with sorted sediments that have been mixed
with the ZV-iron flakes

A close-up picture of the sifting/mixing bucket

Moving bag of ZV-iron over pile of
excavated sediments to dump on top for mixing

More of the barrier area has been
installed

Two of the vertical, multi-level
sampling devices installed by the U. S. Geological Survey's (USGS) scientists for
monitoring the performance of the iron barrier after it is installed

One of the horizontal, multi-location
sampling devices installed by USGS scientists for monitoring the performance of the iron
barrier after it is installed

USGS scientists installing access
boxes for two of the horizontal, multi-location sampling devices

View of the barrier project from a
boat on the pond

Close-up of USGS vertical,
multi-level sampling devices

USGS scientists installing one of the
vertical, multi-level sampling devices

USGS scientists installing one of the
horizontal, multi-level sampling devices

More USGS monitoring equipment
installed in the barrier area

Last section of the barrier is
excavated

Oxidized iron from sections of
installed barrier
|