| Ashumet
Pond Geochemical Barrier Project |
Photographs:

Start of de-watering: yellow hoses
discharging pumped water from inside the aqua-barrier set-up to areas in between the silt
barrier and the outside of the aqua-barrier set-up

Close up picture of one of the pumps
de-watering the areas inside of the aqua-barrier set-up

Start of de-watering on Wednesday,
August 18, 2004

End of de-watering on Wednesday,
August 18, 2004

Pipes for large pump are off-loaded
at boat ramp

Large pump is off-loaded at boat ramp

Large pump is moved along shoreline
of Ashumet Pond

Moving barrier closer to shoreline to
make a better seal with pond edge

Pumping water out of barrier area
with large pump moved to site 8/19/04

Barrier area is de-watered
|

|